Results 21 to 26 of 26
-
January 10th, 2018 01:49 PM #21
theyre extending rails also...
Sent from my SM-G935F using Tsikot Forums mobile app
-
Verified Tsikot Member
- Join Date
- Jan 2018
- Posts
- 18
January 10th, 2018 02:02 PM #22Ang ganda siguro ng outcome nito pag natapos. Mala-off road ang C6 nung hindi pa inayos. Para kang galing sa trail. Haha. Kawawa suspension ng sedans. Parang nagbo-bottom out yung suspension.
-
January 12th, 2018 09:02 AM #23
Boss pag tinignan mo sa Google Maps aba'y napakaraming boto ang mawawala sayo diyan
===
ROW acquisition for this project will be totally insane.
-
April 20th, 2023 10:59 AM #24
Southeast Metro Manila Expressway
walang pa bang update kung kelan ito matatapos?
-
April 20th, 2023 11:14 AM #25
During the pandemic madami nang nakapaskil na notice of ROW while ginagawa ang current structure sa C5. Pati suking barbershop ko nagsara dahil lilipat na daw sila to another location. Then crickets. Balik lahat ng business to their old locations when the restrictions were eased. AFAIK wala pang further construction between C5 and Arca. Ang naayos pa lang so far is the C5/Bayani Road cloverleaf.
-
Verified Tsikot Member
- Join Date
- Jul 2016
- Posts
- 775
April 20th, 2023 11:26 AM #26Saan ang exit nito sa QC? Kasi yung papuntang C-6 right now ay traffic galing batasan pababa ng san mateo. Kailangan maiwasan ang area na yun.
Will wonders never cease with Motolite? Ha ha.
Cheaper brands than Motolite but reliable as well