Results 1 to 10 of 13
Hybrid View
-
March 28th, 2015 07:59 AM #1
If I am not mistaken, a technical description is made by a duly licensed private surveyor. Costs about PHP3,000.
Ibibigay sa iyo ay drawing of the lot confirming the lot description in the TCT.
:gin:
- - - - - - - - - - - - - - - - - - - - - -
If I am not mistaken, a technical description is made by a duly licensed private surveyor. Costs about PHP3,000.
Ibibigay sa iyo ay drawing of the lot confirming the lot description in the TCT.
:gin:
The 12-month warranty on the factory battery ended a few days ago. SOH is still good at over 90%,...
Cheaper brands than Motolite but reliable as well